Chimney Rock Rd Temporary Bridge Open 07.03.2023
A temporary bridge has opened over the washout on Chimney Rock road at Franklin Creek. The bridge comes from the winter storms washing out the culverts beneath Chimney Rock road, which bisected the road and created a 80-foot long, 50 foot-deep canyon. The bridge will remain in place until a permanent crossing is designed and…











